Sheet 07Progress

Where we are

Illustrative timeline for a concept project

Six stages from land to keys. Nothing is being built: this is how the timeline of a project like Neralu would read, month by month.

NowStructure, Block B

A concrete frame under construction, with steel rods rising from its columns against a pale sky
Fig. 8. A concrete frame going up.
  1. Jan 2025 to Jul 2025

    Land and approvalsDone

    Title checks, plan sanction and the clearances a project of this size needs before work starts.

  2. Aug 2025 to Oct 2025

    Tree surveyDone

    An arborist mapped all 31 trees, their canopies and their root zones before a single wall was fixed on the plan.

  3. Nov 2025 to Apr 2026

    FoundationsDone

    Pits near the old roots were dug by hand, and machines worked only where the survey allowed them.

  4. May 2026 to Mar 2027

    StructureNow: Structure, Block B

    Columns and slabs rise one block at a time. Block A is complete to the roof, and work is now on the third floor of Block B.

  5. Apr 2027 to Mar 2028

    FinishingNext

    Lime plaster, Kota stone floors, teak windows and the courtyard planting, in that order.

  6. From Jun 2028

    HandoverNext

    Homes are handed over block by block, with a year of care for the trees written into the maintenance plan.